Renewal of Grant of Approval as manufacturer of Pressure Vessel, Heat Exchanger, Boiler, etc.

Firm approved for any activity under Indian Boiler Regulations,1950 by this department shall submit their application for renewal of their approval, before expiring date of their approval. i.e.31st December, in case of manufacturer and laboratory every year or part and 31st March, in case of Pipe Fabricator or Boiler Repairer, after every two years or part.

  • Submission of application along with.
    • Copy of approval / last renewal
    • Chalan for requisite fee.
    • List of work done during last year/two year.
    • Change in machinery, manpower, welders(wherever applicable) etc.
    • Copies of newly appointed/qualified welders(wherever applicable)
  • Scrutiny by Tech. Asst. / Tech. Officer.
  • Review by Director and generation of renewal letter or forwarding letter for verification.
  • Dispatch/delivery of renewal letter (in case of renewal without verification) i.e. based on work done.
  • Visit of verification and submission of report by officer.
  • Scrutiny of report and generation of renewal letter by T.A. / T.O. after receive by Director.
  • Delivery / Dispatch of Renewal Letter.

Every such application shall be accompanied by relevant physical documents as listed below.

Sr. No. Title Download
1 Required filling Form PDF file that opens in new window. To know how to open PDF file refer Help section located at bottom of the site. (00 KB)

Mandatory - Items

  • Application alongwith,
  • Copy of approval / last renewal.
  • Recipted Challan for prescribed fees.
  • List of work done during last year/two year.
  • Change in machinery, manpower, welders(wherever applicable) etc.
  • Copies of newly appointed/qualified welders(wherever applicable).