Directorate of Steam Boilers

Services

Inspection During Modification to Boiler

  • Submission of application with proposal for modification of boiler with following details:
    • Detail information about modification.
    • Drawing showing detail of existing boiler and boiler after proposed modification.
    • Detail drawing of new pressure parts if required in modification.
    • Requisite fee for scrutiny & approval of drawings for modification.
    • Name of approved repairer, who will carry out the work.
  • On approval of proposal and drawing visits for inspection at various stages as per job card, till final inspection after full welding.
  • Submission of application for hydraulic test permission.
  • On grant of permission, hydraulic test in presence of officer.
  • Issue of certificate on satisfactory hydraulic test & inspection.

Every such application shall be accompanied by relevant physical documents as listed below.

Sr. No. Title Download
1 Required filling Form PDF file that opens in new window. To know how to open PDF file refer Help section located at bottom of the site. (33 KB)

Mandatory - Items

  • Application with proposal for modification of boiler along with,
  • Detail information about modification.
  • Drawing showing detail of existing boiler and boiler after proposed modification.
  • Detail drawing of new pressure parts if required in modification.
  • Requisite fee for scrutiny & approval of drawings for modification.
  • Name of approved repairer, who will carry out the work.
Go to Navigation