Directorate of Steam Boilers

Services

Approval of Makers Papers

Every manufacturer has to prepare certificate in relevant form for product/item manufactured by them under IBR.

  • Submission of application along with,
    • Maker’s paper in relevant form and as built drawing (where applicable) provisional approved drawings.
    • Detail of inspection fees paid.
    • Job card duly signed by Inspection officer & c/signed by Jt. Director / Director
    • Reports of radiography, heat treatment charts (wherever applicable) PTC test report etc. duly accepted.
    • Accepted copies of material certificates.
  • Scrutiny of documents by Technical assistant/Technical officer
  • Sign by Inspection officer i.e. Dy. Director / Jt. Director/ Director.
  • c/sign by Director after review.
  • Delivery of maker’s paper duly signed, to Applicant.

Every such application shall be accompanied by relevant physical documents as listed below.

Sr. No. Title Download
1 Required filling Form Statement of Minimum Rates of Wages (34 KB)

Mandatory - Items

  • Maker’s paper in relevant form and as built drawing (where applicable) provisional approved drawings.
  • Receipted Challan for prescribed fees.
  • Job card duly signed by Inspection officer & c/signed by Jt. Director / Director
  • Reports of radiography, heat treatment charts (wherever applicable) PTC test report etc. duly accepted.
  • Accepted copies of material certificates.
Go to Navigation